Top
Other
2009 Toyota Land Cruiser V8 5.7L for sale
  • 2009 Toyota Land Cruiser V8 5.7L for sale
  • 2009 Toyota Land Cruiser V8 5.7L for sale
  • 2009 Toyota Land Cruiser V8 5.7L for sale
30 000$ 27 321.15€

2009 Toyota Land Cruiser V8 5.7L for sale

January 13, 2020
LIT2138
This Toyota Landcruiser is in excellent condition with no scratches and no accident history.Only serious buyers should Contact Sami at dawoodsami54@yahoo.com for more information on how to buy this car.Export services can be provided.
Contacts : Send a message,
  • Type : 4x4
  • Brand : Toyota
  • Model : VXR
  • Year : 2009
  • Mileage : 29000Km
  • Horse Power : 5700c.
  • Energy : Petrol
  • Color : Black
  • Interior : Leather
  • Interior Color : Gray
  • Gearbox : Automatic
  • Vehicule inspection : OK
  • Number of Doors : 4 doors
  • Features : Power Windows, Sunroof, Power locking, Steering, Automatic A/C, Radio CD, Radio MP3, DVD Player, Electric mirrors, Heated Seats, GPS, Parking Aid
  • Security Equipment : 4 wheel drive, Traction, Fog lights, ABS, Cruise Control, Alarm, Airbag (s), ESP, Checking tire pressure
  • Misc Equipment : Tuning, Alloy Wheels, Hitch, Trip Computer, Metallic paint, Rain Sensor, Ignition lights
Cars, Vehicles >> Used Cars
Classified ads 1 - 30 out of 32
order by price | relevance

advertisements